DC100/200 ILT Radiometer Retrofit

Instructions for installing the ILT1000 radiometer in an existing Dip Coater that is already using the G&R Labs Model 204 or the Delta Ohm DO9721.

**10/25/26 - This is a work in progress and will be regularly updated until completed.

Contact rfranzwa@par.com with any questions or change requests.
  • 1. Preparation and Tools Needed
    • 1.1. Tool and Supply List
    • 1.2. Machine Preparation
  • 2. Remove Machine Components to Access Radiometer
    • 2.1. Remove Roof Skins
    • 2.2. Remove Side Window and Brackets
    • 2.3. Remove Side Skins
    • 2.4. Remove Radiometer Stage Skins
  • 3. Remove Existing Radiometer and Cabling
    • 3.1. Begin Existing Probe Cable Removal
    • 3.2. Front Panel, HMI, and Top of Machine
    • 3.3. Electrical Enclosure
  • 4. Install the New Radiometer and Run Cables
    • 4.1. New Arm Installation
    • 4.2. Cable Installation
  • 5. Install USB Hub in Enclosure and Connect Cables
    • 5.1. USB Hub Installation
    • 5.2. Connect USB Cables
  • 6. Software Configuration
    • 6.1. Assigning COM Ports
  • 7. Reinstall Skins on Machine
    • 7.1. Reinstall Radiometer Skins
    • 7.2. Reinstall Side Skins and Window