Home → DC100/200 ILT Radiometer Retrofit → Install the New Radiometer and Run Cables → Cable Installation
4.2. Cable Installation
-
Plug new USB cables into ILT1000 – CBL30013 closest to enclosure & CBL30014 closest to radiometer stage (include if only one probe used)
-
Secure cables to radiometer stage carriage
-
Run USB cable ends through arm side of radiometer Igus chain
-
Fasten Igus end to carriage
-
Lay radiometer sensor cables (PXS30220, 30224, 30226) and USB cables (CBL30013, 30014) through the Igus, making sure cables are not twisted inside the Igus chain
-
Re-install Igus chain cover
-
After cover has been fully installed, attach the other Igus end to the radiometer side skin
-
Add a cable tie every 12-18 inches up to the roof skin
-
Run USB cables through the hole in the roof skin
-
Secure cables to the bundle going across the machine to electrical enclosure
-
Run cables down into electrical enclosure