Home → DC100/200 ILT Radiometer Retrofit → Install the New Radiometer and Run Cables → New Arm Installation
4.1. New Arm Installation
-
Probe(s) should still be attached to the radiometer arm at this point
-
Remove radiometer arm from carriage (bolt locations indicated below)
-
Place old arm on table next to new arm (with ILT1000s already installed) and match left-right positioning of probes – Use stage side of arm as your reference point (pic)
-
Secure new probes to new arm
-
Fasten the new arm to the radiometer stage carriage using the same hardware removed in step 2
This page was: Helpful |
Not Helpful